2024 Distributed Solar and Storage RFP
Distributed energy resources (“DERs”) are a significant component of PSE’s preferred portfolio from PSE’s Integrated Resource Plan (“IRP”) and represent a piece of PSE’s strategy for achieving the targets laid out under the Clean Energy Transformation Act (“CETA”). In addition to its All-Source, DER and DSS RFPs, PSE will be issuing a voluntary Distributed Solar and Storage (“DSS”) RFP in 2024 to solicit distributed solar and storage resources.
In early 2022, PSE selected a vendor for its virtual power plant (“VPP”) platform that will be used to dispatch DERs. PSE is currently working on developing and testing the VPP platform, which will manage all applicable DERs in the future. Further details on VPP integration are provided in the RFP. Updates to the schedule and documents will be published below, as well as sent to stakeholders. To be added to the DSS RFP stakeholder distribution list, contact SolarStorageRFPmailbox@photographywaltz.com.
The following estimated schedule is subject to adjustment based on the actual pace of the evaluation process. More information on the DSS RFP process and timeline will be provided throughout the process.
To submit a bid for the 2024 DSS RFP, qualified respondents must create and register an account at PSE’s RFP submission portal.
-
2024 DSS RFP Schedule
The following represents PSE’s initial projected timeline.
Date Milestone May 20, 2024 PSE issues final DSS RFP and files it with the UTC June 24, 2024 RFP submission portal opens and PSE starts accepting proposals August 19, 2024 RFP submission portal closes and offers are due to PSE September 18, 2024 PSE posts compliance report to its RFP website, consistent with the requirements of WAC 480-107-035(5) Q1 2025 PSE completes evaluation, selects DSS RFP shortlist and notifies Respondents. Respondents are then required to begin their Schedule 152 application Q1-Q2 2025 PSE negotiates and executes agreements with shortlisted Respondents *All submissions must be received by PSE no later than 11:59 p.m. Pacific Time, on the due date. This timetable is provided for planning purposes only and may be modified by PSE as required.
-
Updates and Notifications
As the RFP process progresses and new information becomes available, PSE will update this portion of the website to include information related to a variety of RFP topics.
Q&A from bidders and interested parties
Questions about the DSS RFP may be directed to PSE’s SolarStorageRFPmailbox@photographywaltz.com. PSE will periodically tabulate and post questions received and PSE’s responses for the benefit of all interested parties. PSE will not include company names, project names, contact information or other identifying descriptors in the Q&A posted to the website.
Q&A from bidders and interested parties from RFP mailbox (updated 8/7/2024)
RFP Docket Updates (UE-240377)
Interested parties can find information about the 2024 DSS RFP approval process and any subsequent updates on the WUTC's web site in the DSS RFP docket UE-240377. Last year’s RFP and summary results can be found under docket UE-220971. PSE will post here a compliance report within 30 days after the close of the bidding period, consistent with the requirements of WAC 480-107-035(5).
PSE posts a proposal summary report pursuant to WAC 480-107-035(5), which includes an attachment containing a summary of each proposal and offer received. PSE also files an informational filing in docket UE-240377 in an effort to make this information more broadly available to stakeholders. (posted 9/18/2024)
Reference Material:
- PSE Electric and Dual Fuel Service Area Zip Codes (updated 6/16/21)
- Interconnection information: http://www.oatioasis.com/psei/, updated tech specs for small generation interconnection can be found in the folder “PSE TECH SPECS FOR INTERCONNECTION” under the file name “TIIR for Non-Jurisdictional Distributed Energy Resources” (updated 4/29/2024).
- Hosting Capacity (arcgis.com): hosting capacity map
-
2024 DSS RFP Documents and Submission
PSE filed the final DSS RFP with the WUTC on May 20, 2024 in docket UE-240377. Interested parties can view and download the DSS RFP by clicking the links below, or by visiting the WUTC's DSS RFP docket UE-240377.
Questions about the DSS RFP may be submitted to the SolarStorageRFPmailbox@photographywaltz.com. PSE will periodically tabulate and post questions received, and PSE’s responses for the benefit of all interested parties. PSE will not include company names, project names, contact information or other identifying descriptors in the Q&A posted to the website. See Updates and Notifications section above to view a current copy of the Q&A.
2024 DSS RFP Materials:
RFP Main Document (5/20/2024)
Exhibit A: Evaluation Criteria and Scoring (5/20/2024)
Exhibit B: RFP Proposal Form (5/20/2024)
Exhibit C: BESS Requirements (5/20/2024)
Exhibit D: Confidentiality Agreement (5/20/2024)
Exhibit E: Avoided Cost (5/20/2024)
Exhibit F: Prototype Ownership agreement (5/20/2024)
Exhibit G: Prototype BESS agreement (5/20/2024)
Exhibit H: Prototype PPA agreement (5/20/2024)
Exhibit I: Resources (5/20/2024)
Exhibit J: Customer Consent (5/20/2024)